Service
Full Apartment Demolition
Full demolition is our most comprehensive service, aimed at rethinking the floor plan: we remove all non-bearing structures and surface finishes down to the load-bearing skeleton. The site is handed over as a bare concrete shell, ready for a new floor-plan implementation.
What the service includes
- Removal of all non-bearing interior walls
- Removal of all surface finishes (floor, wall, ceiling) down to concrete/shell
- Kitchen and bathroom in full
- Suspended ceilings, soffits, raised floor structures
- Fixed furniture and interior doors
- Full-scale dust protection, waste removal and final cleaning
What it's suitable for
Suitable for full renovations where the apartment's floor plan is completely reimagined, and for situations where the condition of the home requires radical interior work (e.g. microbial damage, indoor air problems, outdated electrical or HVAC installations). NOT suitable if you want to preserve some surface materials — then partial demolition (interior demolition) is better.
Local context
Full demolition of a two-room apartment (40–65 m²) usually takes 3–5 working days. For larger sites (over 100 m²) the per-m² price drops (€32/m² vs €38/m² for studios) and the work takes 5–10 working days.
Frequently asked
What are load-bearing structures and how do I know if my apartment's walls are load-bearing?
What if the apartment contains asbestos?
How long does the whole project — demolition + new renovation — typically take?
Next step
Free estimate visit — written offer within 24 h
We visit the site, measure the area and tell you the price before work begins. No commitment.
Book an estimate